Change Language
rameshpv2011@gmail.com | goldct@ymail.com
Call Us :- 08045811770
Erode Cooling Tower

Erode Cooling Tower

Product Details:

  • Air Flow 3200 CFM
  • Material FRP (Fibre Reinforced Plastic)
  • Application Industrial cooling, HVAC systems, process water cooling
  • Motor 3 HP, 1400 RPM
  • Condition New
  • Type Induced Draft Cooling Tower
  • Dimension (L*W*H) 1220 x 1220 x 1370 mm
  • Click to view more
X

Erode Cooling Tower Price And Quantity

  • 1 Set
  • FRP 4 Blade, Heavy Duty
  • Honeycomb PVC Fill Blocks
  • Outdoor/Indoor Both
  • Water
  • Up to 65°C
  • Floor Mounted
  • Approx. 180 kg
  • Corrosion Resistant
  • 10+ Years (with Proper Maintenance)
  • PVC, Efficient Drift Loss Control
  • 32°C (typical)
  • 37°C (typical)

Erode Cooling Tower Product Specifications

  • Cross Flow
  • 3200 CFM
  • Three Phase, 50 Hz
  • Low Noise Level Design
  • Induced Draft Cooling Tower
  • Industrial cooling, HVAC systems, process water cooling
  • FRP (Fibre Reinforced Plastic)
  • 1220 x 1220 x 1370 mm
  • 3 HP, 1400 RPM
  • 20 m/hr
  • 415 V
  • PVC
  • Not Applicable (Cooling Tower does not contain a compressor)
  • Submersible with 3 HP Output
  • New
  • FRP 4 Blade, Heavy Duty
  • Honeycomb PVC Fill Blocks
  • Outdoor/Indoor Both
  • Water
  • Up to 65°C
  • Floor Mounted
  • Approx. 180 kg
  • Corrosion Resistant
  • 10+ Years (with Proper Maintenance)
  • PVC, Efficient Drift Loss Control
  • 32°C (typical)
  • 37°C (typical)

Erode Cooling Tower Trade Information

  • Coimbatore
  • Telegraphic Transfer (T/T), Cash Advance (CA), Cash in Advance (CID), Cash on Delivery (COD), Letter of Credit (L/C), Cash Against Delivery (CAD)
  • 10 Set Per Week
  • 15 Week
  • Western Europe, Africa, Central America, North America, Australia, Asia, Middle East, Eastern Europe, South America
  • South India

Product Description

PRODUCT-COOLING TOWER - 50TR to 1500TR

1. FRP COUNTER FLOW COOLING TOWERS

2.CROSS FLOW COOLING TOWERS

3. TIMBER COOLING TOWERS / WOODEN COOLING TOWERS

4. NATURAL DRAFT COOLING TOWERS

5. DRY COOLERS / ADIABATIC COOLERS

6. OUR SERVICES-Upgrade Efficiency of Existing Cooling Tower

Replace and Repair other Make Cooling Tower and Parts

Technical Specifications


Tower Type

Induced Draft

Usage/Application

Industrial

Cooling Capacity

100 To 500 TR

Shape

Square

Brand

Gold Cooling Towers

Tower Material

Fiberglass Reinforced Polyester




Advanced Cooling Efficiency

The Erode Cooling Tower is equipped with four FRP blades and a cross-flow design, maximizing air and water interaction for superior cooling. Its efficient drift eliminator and honeycomb PVC fill blocks minimize water loss while maintaining high heat transfer rates. This allows for consistent operation and reduced operating costs in industrial settings.


Adaptable and Durable Construction

Designed for flexibility, this cooling tower can be installed both indoors and outdoors, handling temperature resistance up to 65C. Its corrosion-resistant FRP structure ensures longevity in harsh environments. The floor-mounted system supports stable installation, and the submersible water pump motor ensures reliable circulation over years of service.


Low Noise, High Performance

Engineered for quiet operation, the cooling towers low-noise design makes it suitable for sensitive environments. With an airflow of 3200 CFM and a powerful 3 HP motor, it delivers effective cooling while minimizing disruption. The stable three-phase power supply and energy-efficient design offer enduring performance in demanding applications.

FAQs of Erode Cooling Tower:


Q: How does the FRP 4-blade fan improve the cooling towers performance?

A: The FRP 4-blade fan enhances air movement through the tower, promoting effective heat exchange between water and air. FRP (Fibre Reinforced Plastic) ensures durability and corrosion resistance, making the fan suitable for industrial and outdoor environments.

Q: What benefits does the honeycomb PVC fill provide?

A: Honeycomb PVC fill increases the contact surface area for water and air, significantly improving the heat transfer efficiency of the cooling tower. Its lightweight, corrosion-resistant structure ensures long service life and consistent performance.

Q: When should the Erode Cooling Tower be serviced to ensure optimal operation?

A: Regular maintenance should be performed every three to six months, including cleaning the fill blocks, inspecting the motor, and evaluating the drift eliminator. Proper maintenance extends the towers service life to over 10 years.

Q: Where can this cooling tower be installed?

A: This model is suitable for both indoor and outdoor setups, thanks to its corrosion-resistant structure and weatherproof design. It is commonly used in industrial plants, commercial HVAC systems, and process water cooling facilities.

Q: What is the cooling process inside this tower?

A: Warm water enters the tower and is distributed over the honeycomb PVC fill. The induced draft fan draws air through the fill, evaporating a portion of the water, which removes heat. The cooled water collects at the bottom and is recirculated.

Q: How does the cooling tower control drift loss and reduce water waste?

A: The tower utilizes a heavy-duty PVC drift eliminator to capture water droplets entrained in the discharge air. This design helps control drift loss and reduces unnecessary water wastage, enhancing overall efficiency.

Q: What applications is this cooling tower best suited for?

A: It is ideal for industrial cooling, HVAC systems, and process water cooling, offering reliable performance, durability, and energy efficiency for a wide range of commercial and industrial requirements.

Tell us about your requirement
product

Price:

Quantity
Select Unit

  • 50
  • 100
  • 200
  • 250
  • 500
  • 1000+
Additional detail
Mobile number

Email

Other Products in 'Cooling Towers Suppliers' category



"We mainly deals in Andhra Pradesh, Goa, Karnataka, Tamil Nadu, Kerala, Maharashtra, Puducherry, Odisha, Telangana only".
Back to top